Natural heritage
📍 Vinça
♿ PMR
BARRAGE DE VINÇA
The dam has two main functions: to store the water necessary for summer needs and to provide flood control. It is filled from April 1 to June 30 and emptied from July 1 to September 30. The concrete structure is 55 meters high and 192 meters long. Built in 1973, it replaced a hydroelectric plant.
Spoken languages
Español
English
Français
CA
Photo gallery
View all photos →